As questions arise, we will attempt to answer the more frequent general ones here.
Click this link to jump to Snapper Track Appeal FAQs
General FAQs
We are a separate Charity, specifically aimed at restoring the former Lynton and Barnstaple Railway in the southern section from Wistlandpound Reservoir to Barnstaple. We have good relations with our friends at Woody Bay and a Memorandum of Understanding between both charities, aimed at developing co-operation and working together on the overall project to restore the whole of the line, from Lynton to Barnstaple. Most, if not all of our volunteers are also members of the LBR Trust.
Absolutely not. The magnificent railway at Woody Bay is the standard that we all strive for, and it will be many years before we can replicate that in the Yeo Valley. In the long term, you will see a joined-up railway, where you will not be able to tell who built which parts.
Because of the way the trackbed was sold off in 1935, we don’t have the normal situation of most heritage lines, where a station could act as an operating base and bridgehead from which to rebuild the line. Instead, our situation is much closer to the restoration of abandoned canals, where the line is blocked by obstacles which need to be overcome before through traffic can commence. We have adopted the Canal Restoration model, which means that we will restore trackbed and relay track in places where we can, whilst simultaneously dealing with the obstructions as time and finances permit. This means that it may be some years before regular trains operate over a section of restored line. Where we do reinstate track, we plan to have a small diesel loco to operate maintenance trains for our volunteers. Only when we have suitable station facilities and enough track to be commercially viable will we be able to give rides. This is some years away.
Yes, completely, although the initial track laid may not be fully compatible for some years, if this means that we can rebuild the line more quickly. All structures and infrastructure will be built with full interoperability by double-headed Manning Wardles as the design requirement.
By that stage of the project, it will be clear which of the two Trusts is best suited to that job. It may well be that the two Trusts combine, but this is many years away yet.
Chelfham station was only a small country halt sitting on a ledge high above the viaduct. It does not have suitable facilities for a modern station, such as parking, toilets, and catering and nowhere to put them without damaging the historic nature of the site.
Primarily Bridges. Between Barnstaple Hole Ground and Chelfham there are four destroyed river bridges to install and Skew Bridge, where the road was realigned over the old trackbed. We have designs for all of these locations, but they won’t be cheap to build.
The sheer size of the project and fragmentation of the trackbed ownership was the rationale behind having two groups. Since then, each group has become skilled at different aspects of the project, with L&BRT having expertise in running a historic tourist railway on Exmoor, and B&YVRT specialising in land negotiations and planning. Each is able to operate independently without distracting the other from their core tasks, whilst co-operating and sharing ideas.
Snapper Track Appeal FAQs
The Trust submitted a formal pre Planning Application Enquiry with North Devon Council in July 2026. This is designed to allow the Planning Department to comment on the feasibility and requirements of a scheme before the formal Planning Application is made. The report from the Planners confirmed that the installation of track at Snapper is not of itself controversial, as well as providing a list of formal documents that will be needed to support the planning application. These are relatively straightforward and relate to standard measures such as Biodiversity, Environmental Impact and noise /nuisance considerations, particularly during construction. Work is well advanced on the preparation of the documents, with an application submission in December 2026. Due to the report from our pre application enquiry, we do not anticipate any problems with the planning permission.
Not yet and we deliberately haven’t asked for permission to do that. The Trust’s approach to the restoration of the railway is to follow the Canal Restoration Model, whereby sections of infrastructure are restored as and when possible, whilst aiming for the completion of enough viable sections of the railway so that a service can be provided on the linked-up sections. The track we are laying is only the first link in the chain of the restoration of the longer railway. By installing the track and missing bridges before applying to run a railway, the planning process is simplified and progress is incremental. A Transport and Works Act Order will be required to run the railway as a full blown heritage railway.
No, because we are not seeking permission to extend an operational railway in a National Park. We are only seeking to reinstate physical infrastructure that was removed in 1935. We do not have to address the complex issues of running a modern heritage railway, with visitors, until we are ready to do so. When that time comes, the infrastructure will already be in place and we will apply for the necessary Transport and Works Act Order, that addresses all of the wider planning considerations required by an operational railway.
Two reasons: It’s been two decades since any meanful track has been laid on the L&B. We have the Pre Planning Report and want to be ready to lay track at soon as permission has been granted. Waiting would delay that by six months.
We also have the offer of a large quantity of suitable rail at an attractive price. Delaying might lose us that deal.